×
btn
Development of Channel 2, Harbours 1 and 2, Beaches, and Shore Protection of the Hulhumale Convention Centre

Development of Channel 2, Harbours 1 and 2, Beaches, and Shore Protection of the Hulhumale Convention Centre

  • Location

    : Hulhumale, Maldives
  • Scope

    : Dredging and excavation of 600,000 cubic meters; beach formation of 41,715 cubic meters; handling of 298,930 metric tons of rock boulders; 16,500 cubic meters of precast concrete works; 6,500 cubic meters of cast-in-situ concrete; and installation of 81,000 square meters of geotextile. Additional works involve geotextile containers, bollards, fenders, lighthouse construction, and landscaping with vegetative soil and grass.
×

Career

One file only.
5 MB limit.
Allowed types: pdf, doc, docx.

×

Send Enquiry