×
btn
Design and Construction of Addu City Road and Drainage System.

Design and Construction of Addu City Road and Drainage System.

  • Location

    : Maldives
  • Scope

    : The design and construction of a drainage system spanning 30 kilometers, including the installation of 27 kilometers of HDPE pipelines, along with the development of a 7-kilometer road network.
×

Career

One file only.
5 MB limit.
Allowed types: pdf, doc, docx.

×

Send Enquiry